Tender cost
[edit] introduction
Usually created as a response to an invitation to tender (ITT), a tender is a submission made by a prospective supplier (the tenderer) which makes an offer for the supply of goods or services. In construction terms the tender could be for the construction of an entire building or buildings, or for providing a distinct set of services such as landscaping.
A tender pricing document sets out the way in which the cleint wishes to review the breakdown of the overall tender prices provided by tendering suppliers. It is effectively an unpriced bill of quantities. The completed tender pricing document is effectively a priced bill of quantities; it sets out the tenderer’s rates, costs and totals and constitutes the tenderer’s complete offer to the client.
The tender cost is the total of all the charges contained in the tender that will be made by the supplier associated with the delivery of the tender requirements. To the client (who issued the ITT), the tender cost usually represents the total cost of taking delivery of the building or service.
Costs in the tender will be broken down and itemised against each stated requirement. This not only makes it easier for tenderers to price the document, it also means clients and their advisers can see exactly what is being offered by the various tenderers, make comparisons between them, see where value lies and where savings can be made.
[edit] Two-stage tendering
Two-stage tendering is used to allow early appointment of a supplier, prior to the completion of all the information required to enable them to offer a fixed price. In the first stage, a limited appointment is agreed allowing the supplier to begin work and in the second stage a fixed price is negotiated for the contract. It can be used to appoint the main contractor early or more commonly as a mechanism for early appointment of a specialist supplier such as a cladding contractor.
[edit] Related articles on Designing Buildings Wiki
- Accounting.
- Approximate quantities cost plan.
- Bills of quantities.
- Budget.
- Business plan.
- Cash flow.
- Common arrangement of work sections.
- Contract sum.
- Contract sum analysis.
- Cost consultant.
- Cost plan.
- Elemental cost plan.
- Initial cost appraisals.
- New Rules of Measurement.
- Pre-tender estimate.
- Spon's Price Book.
- Tender documentation.
- Tender pricing document
- Types of bill of quantities.
- Whole-life costs.
Featured articles and news
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.