Tender cost
[edit] introduction
Usually created as a response to an invitation to tender (ITT), a tender is a submission made by a prospective supplier (the tenderer) which makes an offer for the supply of goods or services. In construction terms the tender could be for the construction of an entire building or buildings, or for providing a distinct set of services such as landscaping.
A tender pricing document sets out the way in which the cleint wishes to review the breakdown of the overall tender prices provided by tendering suppliers. It is effectively an unpriced bill of quantities. The completed tender pricing document is effectively a priced bill of quantities; it sets out the tenderer’s rates, costs and totals and constitutes the tenderer’s complete offer to the client.
The tender cost is the total of all the charges contained in the tender that will be made by the supplier associated with the delivery of the tender requirements. To the client (who issued the ITT), the tender cost usually represents the total cost of taking delivery of the building or service.
Costs in the tender will be broken down and itemised against each stated requirement. This not only makes it easier for tenderers to price the document, it also means clients and their advisers can see exactly what is being offered by the various tenderers, make comparisons between them, see where value lies and where savings can be made.
[edit] Two-stage tendering
Two-stage tendering is used to allow early appointment of a supplier, prior to the completion of all the information required to enable them to offer a fixed price. In the first stage, a limited appointment is agreed allowing the supplier to begin work and in the second stage a fixed price is negotiated for the contract. It can be used to appoint the main contractor early or more commonly as a mechanism for early appointment of a specialist supplier such as a cladding contractor.
[edit] Related articles on Designing Buildings Wiki
- Accounting.
- Approximate quantities cost plan.
- Bills of quantities.
- Budget.
- Business plan.
- Cash flow.
- Common arrangement of work sections.
- Contract sum.
- Contract sum analysis.
- Cost consultant.
- Cost plan.
- Elemental cost plan.
- Initial cost appraisals.
- New Rules of Measurement.
- Pre-tender estimate.
- Spon's Price Book.
- Tender documentation.
- Tender pricing document
- Types of bill of quantities.
- Whole-life costs.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.